Beck Branch Sanitary Sewer Interceptor

Client:
Lockwood, Andrews & Newnam, Inc.
Location:
Plano, TX
Date:
2018
Categories:
Public Works , Surveying ,

1519 established control points and benchmarks at 1,000-foot intervals. Horizontal coordinates were established using GPS and vertical values were established by conventional leveling. All control was tied into the City of Plano control network. 1519 researched public records to obtain the deeds of current property owners, plats, and existing easements within the project limits. Property corners were recovered, boundary lines were resolved, and a property map was created. The topographic survey included the location of pavement edges, curb and gutter, fences and walls, sidewalks, buildings, creeks, tops and toes of slopes, spot elevations, trees six (6) inches and larger, surface locations of utilities, flowlines of existing sanitary and storm sewer manholes where accessible, and other surface features affecting design.

This project also included the preparation of twenty (20) documents for easements with metes and bounds descriptions to be acquired as well as the boundary survey of City of Plano property to be acquired for the North Texas Municipal Water District to expand their existing site. As easements were acquired, 1519 staked the locations of easements and property lines for limits of construction.

1519 also performed the survey of the Level “A” and Level “B” utilities that were marked by a private subsurface utility engineering firm. This included surveying the locations of the marked utility lines, test holes, and locations of all surface utilities within the project limits. 1519 was able to meet all project timelines and budget constraints to ensure the project maintained schedule.