TxDOT FM 428 and County Road 55/West Glendenning Parkway

Client:
Texas Department of Transportation (TxDOT)
Location:
Celina, TX
Date:
2020
Categories:
Aerial , Public Works , Surveying ,

1519 Surveying, LLC (1519) completed the schematic design survey for approximately two (2) miles of FM 428 and County Road 55/Glendenning Parkway, from 1,000 feet west of Dallas Parkway to 1,000 feet east of SH 289 (Preston Road), for the Texas Department of Transportation (TxDOT). 1519 established four (4) permanent horizontal and vertical control monuments and set secondary control points along the proposed route. 1519 field crews recovered property corners and right-of-monuments and 1519 office personnel completed the right-of-way verification map for the proposed route. Field crews also surveyed the locations of drainage structures, utilities, signs, and creeks within the existing right-of-way. 1519 completed the aerial mapping of the proposed route, which included seven hundred (700) feet on each side of the proposed alignment. The planimetric (2D) features were extracted by processing the imagery from a fixed wing flight and the .tin (3D) data was created by using the point cloud data from a helicopter LiDAR flight. Deliverables included signed and sealed control sheets, imagery and point cloud files, and Microstation files completed to TxDOT standards.